ClickPeterborough
  • News
  • Crime
  • Things To Do
  • Your Views
No Result
View All Result
  • TRENDING:
  • Peterborough
  • Cambridge
  • Huntingdon
  • March
  • Wisbech
  • Ely
  • Fenland
  • Whittlesey
  • St Ives
Tuesday, June 10, 2025
ClickPeterborough
  • News
  • Crime
  • Things To Do
  • Your Views
No Result
View All Result
ClickPeterborough
Support Us
No Result
View All Result
  • News
  • Crime
  • Things To Do
  • Your Views
Home News

Ralph Butcher Causeway: A Bridge Closed Longer Than It Has Been Open

News Room by News Room
4:40pm, June 9 2025
in News
News for Peterborough -

New cracks cause more delay in remedial bridge repairs, Ralph Butcher Causeway, Whittlesey Monday 09 June 2025. Picture by Terry Harris.

Share on FacebookShare on Twitter

News for Peterborough - The Ralph Butcher Causeway, once a symbol of improved infrastructure and connectivity, has unfortunately become infamous for its persistent structural issues. After multiple closures due to the emergence of cracks, the bridge remains shut for longer than it has been in actual operation. The latest setback comes in the form of new cracks, which have further delayed the much-anticipated remedial work.

News for Peterborough -
New cracks cause more delay in remedial bridge repairs,<br />Ralph Butcher Causeway, Whittlesey<br />Monday 09 June 2025.<br />Picture by Terry Harris.

New Cracks Prompt Further Delays

Recently, new cracks appeared, adding more complexity to the already prolonged closure. Notably, one crack was found near previous structural fractures on the westbound carriageway, while another emerged along the centre of the road, between both lanes. These developments have necessitated a daily monitoring system, ensuring that any worsening signs are swiftly addressed.

In response, Jones Brothers’ technical experts were required to re-evaluate the planned remedial works. Their assessment was subsequently scrutinized by both County Highways’ own experts and an independent third-party specialist, ensuring that any proposed solutions would adequately restore public safety while maintaining structural integrity.

Contingency Plans: Preparing for the Worst

With safety as the top priority, County Highways has requested an emergency diversion plan from Jones Brothers. This plan would only be implemented if the cracks suddenly worsen significantly or spread to the eastbound carriageway. Local councillors Chris Boden and Michael Fisher have both advocated for meticulous planning to minimize the disruption that such a diversion would cause.

Several months ago, Councillor Boden recommended banning heavy vehicles from using the bridge as an interim measure. Given the recent developments, County Highways is now actively reviewing whether such an approach could prevent full closure while remedial work is undertaken.

News for Peterborough -
New cracks cause more delay in remedial bridge repairs,<br />Ralph Butcher Causeway, Whittlesey<br />Monday 09 June 2025.<br />Picture by Terry Harris.

Ongoing Evaluation: Keeping the Public Informed

Jones Brothers continues to measure the cracks daily, submitting reports to County Highways. A RAG-rating system(Red, Amber, Green) has been instituted to indicate whether the bridge remains safe for public use. Currently, the rating sits at Green, meaning that no further restrictions have been deemed necessary. However, should it turn Amber, additional safety measures would be reviewed. If it ever reaches Red, a full closure would likely be enforced while a comprehensive safety audit is conducted.

Advertisements
canopyuk.com in-article

Despite growing concerns, County Highways maintains that the new central crack does not affect the planned remedial works. According to Councillor Boden, a start date for repairs has been decided, though it remains undisclosed until absolute certainty is established to avoid further postponements.

News for Peterborough -
New cracks cause more delay in remedial bridge repairs,<br />Ralph Butcher Causeway, Whittlesey<br />Monday 09 June 2025.<br />Picture by Terry Harris.

Roadmap to Restoration

The remedial works are expected to span 22 weeks, beginning with nailpiling, followed by shotcreting, which is weather-dependent due to temperature sensitivity. After completion, the bridge will fully reopen and undergo a settling-in period before final resurfacing, scheduled for next year. The resurfacing phase marks the only planned full closure of the bridge, with timing carefully selected to minimize disruption.

With flood risks along the B1040/North Bank increasing annually beyond October, urgency surrounds the completion of these works. Councillors Boden and Fisher remain actively engaged, closely monitoring the process to ensure proper execution and transparency.

All work remains at the contractor’s expense, ensuring no additional cost burden falls on the County Council or taxpayers.

For further updates, Councillor Boden can be reached at cboden@fenland.gov.uk.

Cathedral Shaun
Advertisements
Pictures

Advertisement
Tags: HomepagePeterboroughtraffictravel
ShareTweetSend

Help us by Donating

News for Peterborough -
News

Ralph Butcher Causeway: A Bridge Closed Longer Than It Has Been Open

June 9, 2025
News for Peterborough -
News

What went wrong with the Ralph Butcher Causeway? Councillor Update.

June 9, 2025
News for Peterborough -
News

Lifeline” Peterborough bus service threatened as Mayor refuses to rule out cuts 

June 5, 2025
News for Peterborough -
News

Traffic chaos on Frank Perkins Parkway

June 3, 2025
News for Peterborough -
News

Peterborough Regional Pool Nears Final Days as City Mulls Future Use of Site

June 2, 2025
News for Peterborough -
News

Tragic Accident: 18-Year-Old Man Killed in Car-Bus Collision

June 2, 2025
  • Trending
  • Comments
  • Latest
News for Peterborough - Police are appealing for witnesses and dashcam footage after a man died in a collision near Ely.

Owen Bird of March charged after A605 death crash which killed Peterborough man

December 27, 2024
News for Peterborough -

Threat to close £32m King’s Dyke crossing at Whittlesey if movement and cracking intensifies

October 18, 2024
News for Peterborough - Family and friends have paid tribute to talented musician Nick Smith of Peterborough whose death has been confirmed overnight. He was a member of Genesis Connected. PHOTO: Genesis Connected

Tributes to Peterborough musician Nick Smith of Genesis Connected

January 24, 2025
News for Peterborough -

VIDEO: Freight train hits Iceland delivery truck at March, Cambridgeshire

October 15, 2024
News for Peterborough -

High Flyer makes a ‘mug’ of planners

0

Town with unenviable crime record

0
News for Peterborough -

New owners of historic Cambridgeshire hotel bans sale of booze

0
News for Peterborough -

Child cruelty sentences for baby’s parents

0
News for Peterborough -

Ralph Butcher Causeway: A Bridge Closed Longer Than It Has Been Open

June 9, 2025
News for Peterborough -

What went wrong with the Ralph Butcher Causeway? Councillor Update.

June 9, 2025
News for Peterborough -

Lifeline” Peterborough bus service threatened as Mayor refuses to rule out cuts 

June 5, 2025
News for Peterborough -

Traffic chaos on Frank Perkins Parkway

June 3, 2025
News for Peterborough -
News

Ralph Butcher Causeway: A Bridge Closed Longer Than It Has Been Open

June 9, 2025
News for Peterborough -
News

What went wrong with the Ralph Butcher Causeway? Councillor Update.

June 9, 2025
News for Peterborough -
News

Lifeline” Peterborough bus service threatened as Mayor refuses to rule out cuts 

June 5, 2025
News for Peterborough -
News

Traffic chaos on Frank Perkins Parkway

June 3, 2025
News for Peterborough -
News

Peterborough Regional Pool Nears Final Days as City Mulls Future Use of Site

June 2, 2025
News for Peterborough -
News

Tragic Accident: 18-Year-Old Man Killed in Car-Bus Collision

June 2, 2025
  • News
  • Local Council
  • Investigations
  • Things To Do
  • Privacy Policy
  • Contact Us

© COPYRIGHT - UNIT 2 FENGATE TRADEPARK PETERBOROUGH PE15XB

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • 360 Examples
  • Advertise with us
  • ARTICLE FOOTER NOT FOR PUBLICATION
  • Basket
  • Beer Festival VR 360
  • Buy Adspace
  • Cambridgeshire
  • Cancel donation
  • Cathedral Example 360
  • Cathedral Plan
  • Checkout
  • Checkout
  • Complaints
  • Contact Us
  • Cookie Policy
  • cookie-policy
  • Elementor #420
  • Hide Ads for Premium Members
  • Home
    • CambsNews Live
  • Latest News
  • Media Consent Form
  • Memorial Garden Example
  • My Account
  • My account
  • Notices
  • Notices Form
  • Privacy Policy
  • PU test
  • Sample Page
  • Sample Page
  • Shop
  • SiteMap
  • Submit Your News
  • Support our work.
  • test2
  • Thank you for your donation
  • Upload your ads

© COPYRIGHT - UNIT 2 FENGATE TRADEPARK PETERBOROUGH PE15XB