ClickPeterborough
  • News
  • Crime
  • Things To Do
  • Your Views
No Result
View All Result
  • TRENDING:
  • Peterborough
  • Cambridge
  • Huntingdon
  • March
  • Wisbech
  • Ely
  • Fenland
  • Whittlesey
  • St Ives
Wednesday, June 11, 2025
ClickPeterborough
  • News
  • Crime
  • Things To Do
  • Your Views
No Result
View All Result
ClickPeterborough
Support Us
No Result
View All Result
  • News
  • Crime
  • Things To Do
  • Your Views
Home News

ScottishPower £1m wind turbine blaze at Coldham, Cambridgeshire

ScottishPower Renewables reported net profit for 2023 of £948.8 million

John Elworthy by John Elworthy
3:29pm, February 2 2025
in News
News for Peterborough - Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris

Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris

Share on FacebookShare on Twitter

With a replacement likely to cost in excess of £1m, ScottishPower Renewable (UK) is assessing the cause of a fire that destroyed one of their wind turbines at Coldham near Wisbech earlier today. Coldham Windfarm was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group.

Coldham was equipped with eight Vestas turbines, capable of generating up to 16 megawatts of cleaner greener energy.

In 2012, the Coldham II wind farm was added, which has seven turbines and the capacity to generate 14 megawatts of energy.

Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris
Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris
Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris
Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris
Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris
Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris

Cambridgeshire Fire and Rescue called crews from March, and from Stanground in Peterborough to tackle the blaze which broke out at around 10am.

Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris
Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris

“You may have seen there is a fire involving a wind turbine near Coldham,” said a fire service statement.

“We have firefighters at the scene working hard to extinguish the fire.

“If you see the flames on your travels, please be assured that we are aware of the fire and have it under control.”

Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris
Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris

Coldham II wind farm was built next to the original Coldham Wind Farm and can power around 8,000 homes. The seven 14MW turbines were built adjacent its Phase I 16 MW sibling.

A year ago, ScottishPower Renewables signed an agreement with Co-op to supply long-term, clean energy from a its solar farm, also located at Coldham.

Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris
Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris

Co-op said it would utilise 100% of the electricity produced from Coldham solar farm for its estate, including food stores, distribution centres and Funeralcare homes right across the UK, over a 15-year period, to increase energy security and accelerate its path towards decarbonisation.

Advertisements
canopyuk.com in-article

In their annual accounts, to December 31, ScottishPower Renewables (UK) Ltd, announced it would continue with windfarms “for the foreseeable future”.

Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris
Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today. PHOTO: Terry Harris

The company said production was lower than the prior year as a result of reduced wind resource along with reduced capacity following the decommissioning of a Scottish windfarm.

“Throughout 2023, the company continued construction of its 9 MW solar project at Coldham wind farm which became operational in March 2024,” it said.

Wind turbine on fire at Coldham near Wisbech
Wind turbine on fire at Coldham near Wisbech, Cambridgeshire. Photo: Simon Varella (who was fishing at nearby Friday Bridge when he took these photos)

ScottishPower Renewables aims to supply Co-op with a peak capacity of 9MW of clean energy – enough to power around 55 Co-op food stores, or the equivalent of 2,000 homes.

Charlie Jordan, CEO, ScottishPower Renewables said, “We’re delighted to partner with companies that understand the importance of decarbonising their operations.

Wind turbine on fire at Coldham near Wisbech
Wind turbine on fire at Coldham near Wisbech, Cambridgeshire. Photo: Simon Varella (who was fishing at nearby Friday Bridge when he took these photos)h

“By securing long-term commitments, PPAs provide stability, certainty, and ultimately accelerate our journey towards a greener, more resilient energy landscape.”

The Coldham solar farm is co-located with SPR’s existing Coldham windfarm.

Wind turbine on fire at Coldham near Wisbech

Coldham is one of a number of ScottishPower Renewables’ large-scale clean energy developments in the East Anglia region.

Wind turbine on fire at Coldham near Wisbech
Wind turbine on fire at Coldham near Wisbech, Cambridgeshire. Photo: Simon Varella (who was fishing at nearby Friday Bridge when he took these photos)
Wind turbine on fire at Coldham near Wisbech, Cambridgeshire. Photo: Simon Varella (who was fishing at nearby Friday Bridge when he took these photos)
Wind turbine on fire at Coldham near Wisbech, Cambridgeshire. Photo: Simon Varella (who was fishing at nearby Friday Bridge when he took these photos)

ScottishPower Renewables reported net profit for 2023 of £948.8 million (2022 Restated £268.7 million). A dividend of £843.6 million was paid during the year (2022 £316.3 million).

Coldham Windfarm near Wisbech was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group. It is where a wind turbine burnt out earlier today.

Cathedral Shaun
Advertisements
Pictures

Advertisement
Tags: Cambs fire and rescueColdham wind turbineCoopFens wind turbine blazeHomepageScottishPowerwind turbine blaze
ShareTweetSend
Next Post
News for Peterborough - Church Terrace car park in the centre of Wisbech will become home for the Showmen’s Guild to run their twice-yearly funfair. The first of these – The Mart – takes places from February 28 to March 8. The car park will be closed to motorists for the duration.

Fenland Council saves Showmen’s Guild funfairs at Wisbech

News for Peterborough - Andrew Hickson with some of the Kingfisher team is attached (left to right) Richard Bruce (Andrew Hickson) Julie Hirst and Philip Reynolds. It is now an employee-owned business which allows the founder or owners to exit by selling their shares to a trust run by employees. That founder can exit immediately or over a period of time.

Cambridgeshire funeral company now owned by its workers

Help us by Donating

News for Peterborough -
News

Ralph Butcher Causeway: A Bridge Closed Longer Than It Has Been Open

June 9, 2025
News for Peterborough -
News

What went wrong with the Ralph Butcher Causeway? Councillor Update.

June 9, 2025
News for Peterborough -
News

Lifeline” Peterborough bus service threatened as Mayor refuses to rule out cuts 

June 5, 2025
News for Peterborough -
News

Traffic chaos on Frank Perkins Parkway

June 3, 2025
News for Peterborough -
News

Peterborough Regional Pool Nears Final Days as City Mulls Future Use of Site

June 2, 2025
News for Peterborough -
News

Tragic Accident: 18-Year-Old Man Killed in Car-Bus Collision

June 2, 2025
  • Trending
  • Comments
  • Latest
News for Peterborough - Police are appealing for witnesses and dashcam footage after a man died in a collision near Ely.

Owen Bird of March charged after A605 death crash which killed Peterborough man

December 27, 2024
News for Peterborough -

Threat to close £32m King’s Dyke crossing at Whittlesey if movement and cracking intensifies

October 18, 2024
News for Peterborough - Family and friends have paid tribute to talented musician Nick Smith of Peterborough whose death has been confirmed overnight. He was a member of Genesis Connected. PHOTO: Genesis Connected

Tributes to Peterborough musician Nick Smith of Genesis Connected

January 24, 2025
News for Peterborough -

VIDEO: Freight train hits Iceland delivery truck at March, Cambridgeshire

October 15, 2024
News for Peterborough -

High Flyer makes a ‘mug’ of planners

0

Town with unenviable crime record

0
News for Peterborough -

New owners of historic Cambridgeshire hotel bans sale of booze

0
News for Peterborough -

Child cruelty sentences for baby’s parents

0
News for Peterborough -

Ralph Butcher Causeway: A Bridge Closed Longer Than It Has Been Open

June 9, 2025
News for Peterborough -

What went wrong with the Ralph Butcher Causeway? Councillor Update.

June 9, 2025
News for Peterborough -

Lifeline” Peterborough bus service threatened as Mayor refuses to rule out cuts 

June 5, 2025
News for Peterborough -

Traffic chaos on Frank Perkins Parkway

June 3, 2025
News for Peterborough -
News

Ralph Butcher Causeway: A Bridge Closed Longer Than It Has Been Open

June 9, 2025
News for Peterborough -
News

What went wrong with the Ralph Butcher Causeway? Councillor Update.

June 9, 2025
News for Peterborough -
News

Lifeline” Peterborough bus service threatened as Mayor refuses to rule out cuts 

June 5, 2025
News for Peterborough -
News

Traffic chaos on Frank Perkins Parkway

June 3, 2025
News for Peterborough -
News

Peterborough Regional Pool Nears Final Days as City Mulls Future Use of Site

June 2, 2025
News for Peterborough -
News

Tragic Accident: 18-Year-Old Man Killed in Car-Bus Collision

June 2, 2025
  • News
  • Local Council
  • Investigations
  • Things To Do
  • Privacy Policy
  • Contact Us

© COPYRIGHT - UNIT 2 FENGATE TRADEPARK PETERBOROUGH PE15XB

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • 360 Examples
  • Advertise with us
  • ARTICLE FOOTER NOT FOR PUBLICATION
  • Basket
  • Beer Festival VR 360
  • Buy Adspace
  • Cambridgeshire
  • Cancel donation
  • Cathedral Example 360
  • Cathedral Plan
  • Checkout
  • Checkout
  • Complaints
  • Contact Us
  • Cookie Policy
  • cookie-policy
  • Elementor #420
  • Hide Ads for Premium Members
  • Home
    • CambsNews Live
  • Latest News
  • Media Consent Form
  • Memorial Garden Example
  • My Account
  • My account
  • Notices
  • Notices Form
  • Privacy Policy
  • PU test
  • Sample Page
  • Sample Page
  • Shop
  • SiteMap
  • Submit Your News
  • Support our work.
  • test2
  • Thank you for your donation
  • Upload your ads

© COPYRIGHT - UNIT 2 FENGATE TRADEPARK PETERBOROUGH PE15XB